By Sharon Aron Baron
Starting Monday, The Highway and Bridge Maintenance Division (HBMD) will be performing major bridge rehabilitation on a County-owned bridge on Atlantic Boulevard over the C-1 Canal in Coral Springs.
Located between Riverside and University Drive, a minimum of one lane of traffic in each direction will remain open at all times. Access to businesses, residences, and sidewalks will be maintained.
Work begins Monday, June 13, 2022, and concludes in March 2023, barring any unforeseen conditions and/or weather delays.
The recommended repairs identified by the Florida Department of Transportation will enhance the longevity of the structure by using an innovative deck strengthening design and construction method developed by HBMD. This method, one of the first in Florida, minimizes construction impacts on the public by mainly working on the underside of the bridge.
Lane closures will occur for a period of less than a month to allow for waterproofing and resurfacing of the bridge deck. A minimum of one lane of traffic in each direction will remain open at all times. Access to businesses, residences, and sidewalks will be maintained. Various signs will be posted to warn motorists and pedestrians.
Broward County appreciates your patience as we complete this necessary bridge repair project.
Send Your News to Coral Springs #1 Award-Winning News Site Here.
Author Profile

Related
EventsSeptember 3, 2026Coral Springs Candidates Take Center Stage in Virtual Forums Ahead of Election
NewsSeptember 3, 2026Franz Ferdinand and Maxie Search for Forever Homes in Broward County
EventsSeptember 3, 2026Former Mayor Roy Gold Leads Free Tour of Sandy Ridge Sanctuary
Crime & SafetySeptember 2, 2026Coral Springs Crime Blotter: Police Investigate $41,000 Fraud and Residential Arson



