Florida’s Turnpike Enterprise has commenced a $72.5 million improvement project to upgrade the interchange at Sawgrass Expressway and Atlantic Boulevard in Coral Springs.
This extensive project, which aims to enhance traffic flow and safety, is expected to continue through early 2026.
The project includes widening the Sawgrass Expressway from six to ten lanes between Commercial Boulevard and Atlantic Boulevard (Exit 8), replacing bridges over Atlantic Boulevard to address flooding issues, and reconstructing entrance and exit ramps.
Additional upgrades to Atlantic Boulevard include expanding from two to three lanes in each direction and adding bike lanes between NW 121 Terrace and Lakeview Drive. Other improvements cover stormwater management, lighting, signage, pavement markings, and drainage enhancements.
As part of ongoing construction, the southbound Sawgrass Expressway entrance and exit ramps at Atlantic Boulevard (Exit 8) will be temporarily closed from November 1 at 9 p.m. to November 4 at 5 a.m. Lane closures will otherwise occur mainly during off-peak hours to minimize congestion.
Nearby residents and businesses may experience light, noise, and dust.
Send Your News to Coral Springs’s #1 Award-Winning News Site Here. Don’t Miss Parkland Talk, Tamarac Talk, Coconut Creek Talk, and Margate Talk.
Author Profile

- Editor of Talk Media and writer for Coral Springs Talk. CST was created in 2012 to provide News, Views, and Entertainment for the residents of Coral Springs and the rest of South Florida.
Related
EventsJune 12, 2025TICKET ALERT: Juneteenth Block Party to Warm Up Coral Springs Crowd for Marlon Wayans’ Stand-Up
EventsJune 12, 2025Coral Springs Museum of Art Hosts Midsummer-Inspired Evening Event
Crime & SafetyJune 11, 2025Coral Springs Crime Blotter: Grand Theft, Battery on Officers, and Multiple Arrests
NewsJune 11, 2025Coral Springs Artist Nathalie Alfonso Wins $20K Florida Prize in Contemporary Art